Free installation according to HomePro standards.
What customers will receive
- Servicing for installing shower heater and water heater and connecting to the existing electrical and plumbing system prepared by customers
- Service fee includes labor cost only.
- 180-Day warranty
- Service duration: 45 – 60 minutes
- Customer shall prepare plumbing and electrical systems prior to installation.
Home Service by HomePro proudly offers our tankless shower water heater installation along with hooking up with the existing connections of water supply and electrical power source. Get your water heater prepared and let we handle it for you, saving more time, error, and effort. With our 180-day service warranty, you won’t have to worry about post-installation problems, such as leaks or below-standard installation. Our team of certified technicians, with criminal records carefully checked, will professionally help you to get your shower water heater properly installed.
Service Procedures
- Inspect and recommend the areas or positions of installation
- Properly install the tankless shower/water heater to the existing connections of water supply and power source.
- Recheck and run the operation test after installation
- Hand over the completed work to the customer along with providing suggestions and guidelines.
Terms and Conditions
- Rescheduling/alteration of the servicing date can be feasible at least 2 days prior to the servicing date.
- Liability coverage for any possible damages of items or properties caused by the team will be compensated according to the actual price but is limited to the twice amount of the service fee.
- The company reserves all rights to preclude these flowing circumstances.
- Customer hires third party/unaffiliated personnel to fix, alter, or modify the works of the company.
- Customer hires the company’s service team to perform or carry other tasks or procedures apart from what is stated in the service report sheet without informing the company or the company’s consent.
- Improper usage/maintenance, accidents or parts that exceed expiration date
- In case the worksite height exceeds 3 meters, an additional charge of scaffolding will be applied.
- In case of additional equipment provided by the customer, 50% of their total price or value will be additionally charged as the labor cost.
- Service completion will be deemed final once the customer or induvial on behalf of the customer signs for the completion of service acceptance. There shall be additional charges for any further changes required by the customer.
- Inquiry of permits and security deposit with any government agencies, legal entity of housing estate/condominium, or neighbors must be handled and sorted out by the customer.
- For further inquiries or additional services, please reach out to “HomePro Service” counter at all HomePro stores or contact Call Center 1284 / Line ID: @homeproservice.
-
-
1
Ceiling Repair
SQM.
1000
-
2
Electric wire VAF 2x2.5 Sq.mm.
metre
30
-
3
Electric wire VAF 2 x 4 Sq.mm.
metre
50
-
4
Electric wire VAF 2x6 Sq.mm.
metre
70
-
5
VAF Electricity Wire 2x10 Sq.mm.
metre
70
-
6
Three-pin plug+ box
set
200
-
7
Ground wire THW 1.5 Sq.mm.
metre
10
-
8
Reside current circuit breaker with overload protection + box
item
480
-
9
Circuit Breaker 30 Amp
item
300
-
10
Electric wire Covering rail #4 plastic
metre
70
-
11
Ground Rod 30 cm.
point
200
-
12
Installation of electric system size 2x2.5 sq.mm.
metre
120
-
13
Installation of electric system size 2x4 sq.mm.
metre
140
-
14
Installation of electric system size 2x6 sq.mm.
metre
160
-
15
งานเดินระบบสายดิน THW 1.5 Sqmm.
metre
100
-
16
Braid Stainless Steel size 32"
line
280
-
17
PPR pipe size 1/2"
metre
150
-
18
PPR pipe size 3/4"
metre
200
-
19
PPR pipe size 1"
metre
250
-
20
PPR pipe Connector 1/2",3/4",1"
item
60
-
21
PPR pipe Connector 1/2"(Threaded)
item
200
-
22
PPR pipe Connector 3/4"(Threaded)
item
250
-
23
PPR pipe Connector 1"(Threaded)
item
350
-
24
Ball valve
item
120
-
25
Breaker + box
set
150
-
26
Braid Stainless Steel size 12" to 18"
line
150
-
27
Gouge, drilling, ceiling repair (excluding painting).
point
300
-
28
Metal Nipple Stainless size 1/2"(2)
item
70
SHOWER HEATER INSTALLATION 3000-6000W1,200THB
What customers will receive
- Servicing for shower heater installation (3000-6000W) along with surface routing of electrical and plumbing system
- Service fee includes labor cost and standard equipment determined by the company such as electric wire, ground wire, PVC pipe, etc.
- 180-Day warranty
- Service duration: 45 – 60 minutes
- Customer shall prepare shower heater (3000-6000W) and equipment for installation.
Home Service by HomePro proudly offers our tankless shower heater (3,000-6,000W) installation. Get your water heater prepared and let we handle it for you, saving more time, error, and effort. With our 180-day service warranty, you won’t have to worry about post-installation problems, such as leaks or below-standard installation. Our team of certified technicians, with criminal records carefully checked, will professionally help you to get your shower heater properly installed.
Service Procedures:
- Inspect and recommend the areas or positions of installation
- Properly install the tankless shower heater (3,000-6,000W) along with electrical and plumbing system routing using standard tools.
- Recheck and run the operation test after installation
- Hand over the completed work to the customer along with providing suggestions and guidelines.
Terms and Conditions
- Rescheduling/alteration of the servicing date can be feasible at least 2 days prior to the servicing date.
- Liability coverage for any possible damages of items or properties caused by the team will be compensated according to the actual price but is limited to the twice amount of the service fee.
- The company reserves all rights to preclude these flowing circumstances.
- Customer hires third party/unaffiliated personnel to fix, alter, or modify the works of the company.
- Customer hires the company’s service team to perform or carry other tasks or procedures apart from what is stated in the service report sheet without informing the company or the company’s consent.
- Improper usage/maintenance, accidents or parts that exceed expiration date
- In case the worksite height exceeds 3 meters, an additional charge of scaffolding will be applied.
- In case of additional equipment provided by the customer, 50% of their total price or value will be additionally charged as the labor cost.
- Service completion will be deemed final once the customer or individual on behalf of the customer signs for the completion of service acceptance. There shall be additional charges for any further changes required by the customer.
- Inquiry of permits and security deposit with any government agencies, legal entity of housing estate/condominium, or neighbors must be handled and sorted out by the customer.
- For further inquiries or additional services, please reach out to “HomePro Service” counter at all HomePro stores or contact Call Center 1284 / Line ID: @homeproservice.
-
-
1
Electric wire VAF 2x2.5 Sq.mm.
5
metre
-
2
Ground wire THW 1.5 Sq.mm.
4
metre
-
3
Breaker + box
1
set
-
4
Braid Stainless Steel size 12" to 18"
1
line
-
-
1
Electric wire VAF 2 x 4 Sq.mm.
5
metre
-
2
Ground wire THW 1.5 Sq.mm.
4
metre
-
3
Breaker + box
1
set
-
4
Braid Stainless Steel size 12" to 18"
1
line
-
-
1
Ceiling Repair
SQM.
1000
-
2
Electric wire VAF 2x2.5 Sq.mm.
metre
30
-
3
Electric wire VAF 2 x 4 Sq.mm.
metre
50
-
4
Electric wire VAF 2x6 Sq.mm.
metre
70
-
5
VAF Electricity Wire 2x10 Sq.mm.
metre
70
-
6
Three-pin plug+ box
set
200
-
7
Ground wire THW 1.5 Sq.mm.
metre
10
-
8
Reside current circuit breaker with overload protection + box
item
480
-
9
Circuit Breaker 30 Amp
item
300
-
10
Electric wire Covering rail #4 plastic
metre
70
-
11
Ground Rod 30 cm.
point
200
-
12
Installation of electric system size 2x2.5 sq.mm.
metre
120
-
13
Installation of electric system size 2x4 sq.mm.
metre
140
-
14
Installation of electric system size 2x6 sq.mm.
metre
160
-
15
งานเดินระบบสายดิน THW 1.5 Sqmm.
metre
100
-
16
Braid Stainless Steel size 32"
line
280
-
17
PPR pipe size 1/2"
metre
150
-
18
PPR pipe size 3/4"
metre
200
-
19
PPR pipe size 1"
metre
250
-
20
PPR pipe Connector 1/2",3/4",1"
item
60
-
21
PPR pipe Connector 1/2"(Threaded)
item
200
-
22
PPR pipe Connector 3/4"(Threaded)
item
250
-
23
PPR pipe Connector 1"(Threaded)
item
350
-
24
Ball valve
item
120
-
25
Breaker + box
set
150
-
26
Braid Stainless Steel size 12" to 18"
line
150
-
27
Gouge, drilling, ceiling repair (excluding painting).
point
300
-
28
Metal Nipple Stainless size 1/2"(2)
item
70
|